Project Bathroom - Who doesn't love a good remodel? We all do, just on the shows that neatly package it (or put a few mishaps in it for suspense.... But do you really want to live it and do it? Sure, why not.
That long vanity is just a place for them to put stuff and than knock it over. It takes up TONS of space and the toll they stand on is ALWAYS in front of the cabinet door I need to get into...
Rip it out and sell it - Done!
The tile was actually rather easy to remove (says the girl that watched my husband knock that out) Yes, We thought of not removing the time - but the HUGE plywood underneath the now removed vanity required a discussion.
We choose some tile... Love this tile. But there is ALWAYS a part in a remodel (when you are doing the work) that you see it all open and you just want to blink your eyes and put it back together as it was again.... this was my part. I didn't think I could lay tile straight. Until I did...
Not bad - not perfect. But not bad. Anyone miss the Maroon walls? Nope, me neither. Chris volunteers to knock out both the plumbing and electrical - impressive! Its the perfect sized project to figure this stuff out.
Light fixture anyone - YUCK! Not our style AT all.
Tiling again, this time the backsplash - (one week later...)
As a builder in my past life, I was known for scheduling - meaning I was great at it.... So why the heck did I schedule myself to be tiling the back splash while Chris was replacing the sheetrock - Fail!
Production schedule stopped...... Read the next blog post...
Back to reality (yes, I would like for the boys to STOP using our bathroom and START using theirs)
Sheet rock sanding - of all the things we had to do, plumbing, grout, tile, paint. This was the WORST. Such a MESS. VERY repetitive. Paint in the ASS! I have zero desire for such a level of perfection. I now COMPLETELY understand wall paper and why it became popular.
There was a night I got to use BOTH a caulking gun and a nail gun - Chris was questioning his desire to let me try it...
I am TIRED of brushing my teeth next to sheet rock tools!
What, are those sinks? Might they be hooked up?
Yes, why yes they are.
What, and the boys are using them, 2 and once.
So we both the vanities, sinks and cabinets at Ikea with our Christmas $$, they have been occupying space (not put together) for 7 months. There is NEVER a good time to knock out this project (yes, I was getting PLENTY of feedback with regards to my scheduling) HUGE thank you to my folks for helping with the kiddos here and there - the Leadbetters too (yes, we even had visitors while this was under construction!) Its done (almost - details details) The Webers for their willingness to help and the tools we got to use!- and Linus our neighbor who has a much higher level of perfect than we do - he is hired for our next sheet rocking adventure.
As we expected - we wished we had done it earlier - If you have a remodel you want to do - DO IT! you will love it. Push through.
Chris estimated we would have this done in 3 weeks. I planned for 1 week - Chris wins....
Tile the next one...






















