Monday, October 19, 2015

More Construction?

Why not - this one was SO needed, 
but not wanted (until it gets cold and the furnace stops working.  Over the summer we replaced the boiler - fun right?  
Its REAL pretty.  
Almost as pretty as the propane tank we dragged our sett about putting in.
Estimates, schedules and on Friday, time to install.
See, isn't she pretty?!?!
I asked if we could use the fill from the tank on our flower bed
Not my best idea, I went out 5 minutes later to see ALL THIS ROCK!  
A little trenching for the gas line.
The tank all set.
Time to 'pretty it up' 
Only hitch, where is the inspector?  Its Friday and guess what, they call it quits at 12 - sweet right?!?!  No inspection no gas.  NOT HEAT.  Our fault for stalling.  But who would have thought it would be that cold this weekend.  NO ONE.  20 degrees BOTH nights.
Here is our house Monday morning
Pauli is a smart girl.
Inspector arrived at 9AM Monday morning  - everything passed and the contractors where back within minutes to connect it all - just in time for 60 degree and sunny weather.  At least we will have PLENTY of heat for the winter!
Truth be told, this is the kind of construction I prefer this days.  Wow factor
Drew had a birthday party to attend while we had to 'do something' with all the rocks.  Planning that this is the ONLY behind bars photo we will have to take of this cute kiddo.
Only my husband can turn a pile FULL of rocks into a rock wall in 3 hours.  
LOVE HIM

No comments:

Post a Comment